Government Datacenter Modernization

How we transformed a legacy government datacenter into a state-of-the-art Tier III certified facility with enhanced security and efficiency

Project Overview

A major government organization approached us to modernize their aging datacenter infrastructure. The existing facility, built over two decades ago, was struggling with inefficient cooling, power distribution issues, and outdated security measures.

Our mission was to transform this legacy infrastructure into a modern, efficient, and highly secure Tier III certified datacenter while ensuring zero downtime during the transition.

The Challenge

  • Aging Infrastructure: 20+ year old equipment with frequent failures and high maintenance costs
  • Energy Inefficiency: PUE of 2.8, resulting in excessive operational costs
  • Security Gaps: Outdated physical and cyber security measures not meeting current government standards
  • Zero Downtime Requirement: Critical government services couldn't afford any interruption

Project Details

Client

Government Defense Organization

Industry

Government & Defense

Project Duration

18 months

Services Provided

Datacenter DesignConstructionMigrationSecurity

Our Solution

We implemented a comprehensive modernization strategy that addressed all challenges while ensuring continuous operations

Modular Infrastructure Design

Designed a modular datacenter architecture allowing phased migration without service interruption. Each module was independently powered and cooled.

Energy Efficient Systems

Implemented hot/cold aisle containment, in-row cooling, and high-efficiency UPS systems. Integrated renewable energy sources for partial power supply.

Enhanced Security Measures

Multi-layer security with biometric access, mantrap entries, 24/7 surveillance, and integration with government security protocols.

Implementation Timeline

Phase 1

Months 1-3

Assessment & Design

Comprehensive audit of existing infrastructure, detailed design of new datacenter, and obtaining necessary government approvals.

Phase 2

Months 4-9

Construction & Build-out

Construction of new datacenter modules, installation of power and cooling systems, implementation of security infrastructure.

Phase 3

Months 10-15

Phased Migration

Systematic migration of critical systems with zero downtime, extensive testing at each phase, and rollback procedures.

Phase 4

Months 16-18

Optimization & Certification

Performance optimization, Tier III certification process, staff training, and handover to operations team.

Project Results

The modernization project delivered exceptional results across all key metrics

35%

Energy Savings

PUE reduced from 2.8 to 1.4

99.98%

Uptime

In first year of operation

Tier III

Certified

Uptime Institute certification

Zero

Downtime

During entire migration

Key Achievements

  • Successfully migrated over 500 critical government applications without any service interruption
  • Achieved highest level of physical and cyber security compliance for government facilities
  • Reduced annual operational costs by ₹8.5 crores through energy efficiency improvements
  • Increased datacenter capacity by 3x while using 40% less physical space
“Buffercode's expertise in datacenter modernization was instrumental in transforming our aging infrastructure. Their phased migration approach ensured zero downtime for our critical services, while the new facility has exceeded all our expectations in terms of efficiency, security, and reliability.”

Director of IT Infrastructure

Government Defense Organization